Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

No Alcohol No Drugs - the only addiction is Railfanning, to escape the negativity of the world. - Keshav Singh

Search Forum
<<prev entry    next entry>>
Blog Entry# 5027043
Posted: Jul 28 2021 (21:09)

21 Responses
Last Response: Apr 10 2022 (15:47)
General Travel
57674 views
20

★★★
Jul 28 2021 (21:09)   BQA/Bankura Junction (3 PFs)
Ahin17~
Ahin17~   1676 blog posts
Entry# 5027043            Tags  
What a surprise , Finally Bankura Masagram is all set to increase it's MPS from 80 kmph to 110 kmph
All credits goes to Soumyadeep da , who arranged the documents , i am posting on behalf of him.

And with this a new route towards Hwh is all set to begins it's operation.
...
more...

PROSPECTS:
This section is part of an alternative route to Howrah from Adra side apart from the
overburdened Asansol-Raniganj-Andal-Durgapur and Kharagpur-Tikiapara-Howrah
route, free from passing goods traffic. Distance between Bankura and Howrah will be
reduced by 41 kms, making it the shortest route between them. Henceforth, journey time
will also reduce from existing 4 hrs to 3 hrs. Most stations between BQA and MSAE
have high PPM figure towards both ends.


UPGRADATION OF MAXIMUM PERMIOSSIBLE SPEED IN
BANKURA MASAGRAM SECTION

STATUS:
Renewal and restructuring work between Bankura and Masagram will be over by
04.02.2022. Two new loops have been proposed at Beliatore and Rainagar. There are two
crossing stations i.e., Bowaichandi and Sonamukhi. Foundation of TSS at Indas is ready
to power the OHE facilitating simultaneous train operation at higher speeds.

PROFILE:
KM
Signalling
Permissible Speed
Halts
Level Crossings
LC Eliminated
118
Absolute (S)
BQA-MTIP 80
MTIP-MSAE 65
30
59
35

ENHANCEMENTS:
MPS of this section must be increased to 110 KM/H in order to run express trains at an
average of 80 kmph. MEMU and Passenger services need to operate at 45 kmph average.
Signal posts are to be installed in all eligible halt stations for smooth movement of traffic
in both directions. Interlockings at all stations should be in sync to support reserved
operation.

Translate to English
Translate to Hindi

7 Public Posts - Wed Jul 28, 2021

6 Public Posts - Fri Jul 30, 2021

4 Public Posts - Sat Jul 31, 2021

1 Public Posts - Sun Mar 06, 2022

11918 views
0

Apr 07 2022 (14:46)
KamalMolla
KamalMolla   156 blog posts
Re# 5027043-19               Past Edits
No.......!!!
Translate to English
Translate to Hindi

1 Public Posts - Thu Apr 07, 2022

1 Public Posts - Sun Apr 10, 2022
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy