I think instead of Ahmedabad-Mumbai Indian government should have constructed High speed railway infrastructure between Patna-Delhi via MGS-CNB...The Max speed should not be more than 250 KMPH to cut costs and it should retain 200 KMPH average speed...the normal fare between Patna and Delhi should not be more than 3000 k with not more 25% of the seats up for dynamic pricing..
The Cost per km of high speed rail (HSR) with speeds upto 350 KMPH costs 17-21 million usd / km in China so building 250 kmph HSR will be cheaper and even if 350 kmph fit HSR is constructed the total construction cost between Patna and Delhi will cost something around 20 billion USD or around rupees1.40 lakh crores..BTW...
more...
The Cost per km of high speed rail (HSR) with speeds upto 350 KMPH costs 17-21 million usd / km in China so building 250 kmph HSR will be cheaper and even if 350 kmph fit HSR is constructed the total construction cost between Patna and Delhi will cost something around 20 billion USD or around rupees1.40 lakh crores..BTW...
more...