Search Forum
Blog Entry# 5036327
Posted: Aug 08 2021 (12:19)
3 Responses
Last Response: Aug 09 2021 (09:38)
3 Responses
Last Response: Aug 09 2021 (09:38)
Aug 08 2021 (12:19) 02616/Grand Trunk SF Special (PT) | NDLS/New Delhi (16 PFs)
VijayawadaJunction
VijayawadaJunction 8597 blog postsSeriously GT needs some speedup in down direction...
AP which Departed NDLS 4hrs after it has overtaken it..
It's departure should be delayed from NDLS at least by 1.5hrs if they speedup with current departure (16:10) it well end up in odd timings at MAS...it can start at 17:40 from NDLS and still can retain its same arrival time at BZA 21:45/55..MAS 4:30..
AP which Departed NDLS 4hrs after it has overtaken it..
It's departure should be delayed from NDLS at least by 1.5hrs if they speedup with current departure (16:10) it well end up in odd timings at MAS...it can start at 17:40 from NDLS and still can retain its same arrival time at BZA 21:45/55..MAS 4:30..
Once Mas Raj TT is set.
Automatically GT & TN will see bright days.
Automatically GT & TN will see bright days.
If GT & TN is speeded up & hour's will reduced level playing field between Mas Raj slot gang - GT & TN will become same, SR don't want to lose their AC pax towards CR - NR.
Also nowadays by removing few SL coaches, railways is going to attach 3 AC economy in few Superfast trains.
Raj will lose importance slowly in Speed & AC premium.
maximum...
more...
Also nowadays by removing few SL coaches, railways is going to attach 3 AC economy in few Superfast trains.
Raj will lose importance slowly in Speed & AC premium.
maximum...
more...