Search Forum
Blog Entry# 5046225
Posted: Aug 20 2021 (14:06)
8 Responses
Last Response: Aug 23 2021 (21:10)
8 Responses
Last Response: Aug 23 2021 (21:10)
Aug 20 2021 (14:06) 02079/KSR Bengaluru - SSS Hubballi Jan Shatabdi Special
KoushikPatel~
KoushikPatel~ 2098 blog postsTimings changed from 01.09.2021
Will arrive UBL at 1:00 PM
and
Depart UBL at 1:40 PM to reach YPR at 7:48 PM and SBC at 8:55 PM
...
more...
Will arrive UBL at 1:00 PM
and
Depart UBL at 1:40 PM to reach YPR at 7:48 PM and SBC at 8:55 PM
...
more...
4 Public Posts - Fri Aug 20, 2021
2 Public Posts - Sat Aug 21, 2021
Mysore side trains cannot go to PF 1-4. YPR side trains can get to PF 8-10 only. BNC side trains can go to PF 1-7 only.
Mysore line and YPR lines were Metre Gauge and converted to Broad Gauge. While modifying, railways did not take care of this aspect. Like a Y, only one set of movements are possible. Top 2 arms of Y cannot allow movements between two.
Now also, railways can think of Laying a X type of arrangement between Krishna Flour mill side and Sheshadri Puram so that...
more...
Mysore line and YPR lines were Metre Gauge and converted to Broad Gauge. While modifying, railways did not take care of this aspect. Like a Y, only one set of movements are possible. Top 2 arms of Y cannot allow movements between two.
Now also, railways can think of Laying a X type of arrangement between Krishna Flour mill side and Sheshadri Puram so that...
more...
1 Public Posts - Mon Aug 23, 2021