Search Forum
Blog Entry# 5053148
Posted: Aug 28 2021 (22:41)
5 Responses
Last Response: Aug 29 2021 (08:13)
5 Responses
Last Response: Aug 29 2021 (08:13)
Aug 28 2021 (22:41) 08493/Bhubaneswar - Balangir Intercity Special
Sailesh_TIG
Sailesh_TIG 122 blog postsAfter a long wait, Bhubaneswar-Balangir Intercity Special resumes from 1st September 2021.
~PR~
~PR~
I have traveled in this train in d year 2016 .....
From bbs to Balangir those days this train was used to run with wdm3A Vskp shed locomotive .........
From bbs to Balangir those days this train was used to run with wdm3A Vskp shed locomotive .........
Yes. As the entire SBP division has been electrified now, it runs with WAP 7.