Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

For RailFans, the Journey itself is the Destination. - Sreerup Patranabis

Search Forum
<<prev entry    next entry>>
Blog Entry# 5070255
Posted: Sep 19 2021 (18:48)

3 Responses
Last Response: Sep 21 2021 (00:33)
Timeline
1957 views
0


TC4D^~
Sep 21 2021 (00:33)
Train does 130 in multiple section, we can't add single stretch...
more...
over here
Sep 19 2021 (18:48)   Howrah - Mumbai CSMT AC Duronto Special/02096   Train - Max Permissible Speed
ghij950   49 Conf TLs   66 Void TLs
130 km/hr between ADL/Andul and TATA/Tatanagar Junction

Sep 06 2021 (10:54)   (previous value)
Timeline Entry# 4476214
by: SAPTARSHI^~
130 km/hr

Timeline
2897 views
0

Sep 19 2021 (18:59)
ghij950   738 blog posts
Re# 5070255-1              
FOUR PAIRS OF SER SPECIAL TRAINS TO RUN AS PER

REVISED DEPARTURE/ARRIVAL TIMINGS TO & FRO

HOWRAH DUE TO ACCELERATION OF SECTIONAL SPEED LIMIT
...
more...



Kolkata, 27th August, 2020:



South Eastern Railway,in a bid to make high-speed movement of train services for reaching the passengers to their destinations faster,has decided to accelerate the sectional permissible maximum speed limitfrom 110 kmph to 130 kmph between Andul and Kharagpur o­n Howrah-Kharagpur section in Kharagpur Division.



With the above acceleration of sectional maximum permissible speed, four pairs of trains viz., 02245/02246 Howrah-Yesvantpur-Howrah Special, 02021/02022 Howrah-Barbil-Howrah Special,02810/02809 Howrah-Mumbai CSMT - Howrah Special and 02073/02074 Howrah-Bhubaneswar- Howrah Special trains will run at a maximum permissible speed of 130 kmph instead of existing speed of 110 kmph o­n the above section between Andul and Kharagpur with revised departure/arrival timings to and fro Howrah with effect from 28.08.2020.
.....

Translate to English
Translate to Hindi

Timeline
2642 views
0

Sep 19 2021 (19:00)
ghij950   738 blog posts
Re# 5070255-2              
Later 130 kmph extended to TATA from Kharagpur

SER RAISES SECTIONAL SPEED FOR FASTER MOVEMENT OF TRAINS


Kolkata,
...
more...
5th March, 2021:

....


In Andul-Kharagpur and Kharagpur-Tatanagar Sections speed has been raised from 110 kmph to 130 kmph

Translate to English
Translate to Hindi

2690 views
0

Sep 21 2021 (00:33)
TC4D^~
TC4D^~   15937 blog posts
Re# 5070255-3              
Train does 130 in multiple section, we can't add single stretch over here
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy