Search Forum
Blog Entry# 5079296
Posted: Sep 29 2021 (15:19)
21 Responses
Last Response: Sep 30 2021 (08:33)
21 Responses
Last Response: Sep 30 2021 (08:33)
2 Public Posts - Wed Sep 29, 2021
PM needs nearly 6 hrs, sometimes more than that, also depends on length of train and type (LHB or ICF)
SM takes 3-4 hrs which is carried out at the other end if the round trip distance is more than 3000 km for ICF or 3500 km for LHB. Otherwise SM is done at the base depot.
Every coach has a marking called...
more...
SM takes 3-4 hrs which is carried out at the other end if the round trip distance is more than 3000 km for ICF or 3500 km for LHB. Otherwise SM is done at the base depot.
Every coach has a marking called...
more...
15 Public Posts - Wed Sep 29, 2021
3 Public Posts - Thu Sep 30, 2021