Search Forum
Blog Entry# 5085778
Posted: Oct 04 2021 (17:31)
17 Responses
Last Response: Oct 05 2021 (00:56)
17 Responses
Last Response: Oct 05 2021 (00:56)
ECR should consider constructing a new railway line (shown with ared line in the map) between Belari halt (situauted on the SPJ-BJU main line) and desari railway station (located on the BJU-HJP line) via Musrigharari-Sarai ranjan -jandaha. It will bring down the distance between SPJ-HJP by at least 30 KMs plus trains coming from DBG going to hjp via mfp wilpnt have to waste time in rake reversals..
12 Posts
Theek hai Vro.
But everybody knows koi new line nahi banne wala.
Bihar me waise hi 5-6 new lines 15-20 saal se pending hai
But everybody knows koi new line nahi banne wala.
Bihar me waise hi 5-6 new lines 15-20 saal se pending hai
New line ban na bhi chahiye...already bahut Hain...Ab ECR ko sirf infrastructure sudhar Kar MPS badhane ka sochna chahiye..
Third line ki bhi zarurat hai bahut Sari jagahon par..mainly between Bca-bju,HJP-CPR
Pahle doubling to kar le🤣🤣.
Muzaffarpur Jha Jha route ka tripping ka proposal Railway reject kar diya 2019 me.
Muzaffarpur Jha Jha route ka tripping ka proposal Railway reject kar diya 2019 me.
Utna lamba third line to obviously reject hoga but BCA-KIUL third line to banna hi chahiye atleast. New Rajendra Pul waise bhi double line hi banega.