(YNRK-ADI/Load-25B), After starting Ex.RANI Station, JE/YRD informed that OHE vibrating, checked and found fromt panto PT-2 carbon strip worn out and panto nut bolt between upper & lower frame was loose & nut was missing . Isolated PT-2 and worked with PT-1 with restricted speed 80 kmph. Major/Sec-AII-ABR, Minor/Sec- (RANI-FA), Time-9.44-10.12 hrs.
22561/VTA
...
more...
22561/VTA
...
more...
21 Public Posts - Tue Nov 23, 2021
But hey some good results and progress is shown by the Favieley LX 3600 panto which current WAG 12s are already equipped with and BRC is installing on P4/5/7 left and right whichever one is in the shed and probably use this HR testing opportunity now that the mainline is open to do some extensive testing and hopefully some sensible and logically solution comes out.