Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Feeling bored in the Train - talk to a RailFan. You'll WISH the train gets late.

Search Forum
<<prev entry    next entry>>
Blog Entry# 5149902
Posted: Nov 30 2021 (20:53)

2 Responses
Last Response: Dec 01 2021 (08:57)
Info Update
9048 views
0

Nov 30 2021 (20:53)   AMG/Alamnagar (5 PFs)
Sakthivel~
Sakthivel~   2637 blog posts
Entry# 5149902            Tags  
Admin Ji... Update this info please.... Change track section between Alamnagar to Transport Nagar (Alamnagar Utraita Lucknow bypass) from "Construction- Double line electrification " to " Construction - electric line Doubling".

Proof ke liye : click here
Translate to English
Translate to Hindi

7533 views
0

Nov 30 2021 (21:59)
SPSingh^~
SPSingh^~   2175 blog posts
Re# 5149902-1              
Only single electric line is operational and double line is under construction. Poles has been erected (bracket installed) in double line but wiring are still pending.
Translate to English
Translate to Hindi

5307 views
0

Dec 01 2021 (08:57)
Sakthivel~
Sakthivel~   2637 blog posts
Re# 5149902-2              
No in some sections near Alamnagar, tracks werent laid(tracks starting from 100-150 meters from Alamnagar )
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy