Search Forum
Blog Entry# 5157819
Posted: Dec 08 2021 (21:15)
13 Responses
Last Response: Dec 09 2021 (21:20)
13 Responses
Last Response: Dec 09 2021 (21:20)
SER's 1st centralised monitering and signallling system trial being conducted at new Control Room Adra.
This system will give Real time Information of train movement in yard which will improve Frequency & Punctuality of train movement & also pass safety.
New EI cum Control Centre Adra to manage traffic in the following sections in the division in phased manner:
1. ADRA+JOC-BURN/MOH.
2....
more...
This system will give Real time Information of train movement in yard which will improve Frequency & Punctuality of train movement & also pass safety.
New EI cum Control Centre Adra to manage traffic in the following sections in the division in phased manner:
1. ADRA+JOC-BURN/MOH.
2....
more...
1 Public Posts - Wed Dec 08, 2021
After connection of BQA-MSAE with HBC and completion of VSU TAK line, definitely tripling will be necessary. VSU TAK will absorb most locally originating Kolkata bond traffic of Adra division and may even reduce some load off the HBC and HWH-KGP-TATA.
1 Public Posts - Wed Dec 08, 2021
10 Public Posts - Thu Dec 09, 2021