Search Forum
Blog Entry# 5159498
Posted: Dec 10 2021 (23:13)
6 Responses
Last Response: Dec 11 2021 (17:22)
6 Responses
Last Response: Dec 11 2021 (17:22)
Dec 10 2021 (23:13) 18048/Vasco-da-Gama - Shalimar Amaravati Express (PT) | BHC/Bhadrak (4 PFs)
Snehashish_railfan^~
Snehashish_railfan^~ 25162 blog posts(Before time) Howrah bound Amaravati Express arrived at Bhadrak PF no -3.
5 Posts
Why is GTL written on the big TBs? I mean why are small and large TBs different?
This train runs with one slip train.. may be this is the main reason..But I am also seeing such a board for the first time for Amravati.!!
Slip is detached at GTL but again pursues the journey by being attached to another train
HWH-GTL-HWH ONE SLR CUM LUGG COACH and VSG-KCG-VSG Slip Detached/attached at GTL
Before covid it used to leave HWH with 19 coaches out of which one SLR detached at GTL making it 18+4 slip = 22 coach train. Now it comes with only 18 coaches from HWH as now longer 2A class present in this train. So entire 18 coaches from HWH go to VSG in addition to the 4 slip coaches. I think SER is simply too lazy to change the name boards or in future they will augment with a 2AC so they might have to detach the SLR at GTL again.