#SuratMetro.
J Kumar Infra's 1 of 2 TBM assembled in Palanpur for constructing 3.56 km underground Pkg between Surat Railway Station and Chowk Bazar Ramp. TBM was earlier used for Delhimetro for Phase 3. The TBM was refurbished over 6 month period
©️Aakash Tanwar
J Kumar Infra's 1 of 2 TBM assembled in Palanpur for constructing 3.56 km underground Pkg between Surat Railway Station and Chowk Bazar Ramp. TBM was earlier used for Delhimetro for Phase 3. The TBM was refurbished over 6 month period
©️Aakash Tanwar