Search Forum
Blog Entry# 5190483
Posted: Jan 14 2022 (23:18)
23 Responses
Last Response: Oct 10 2022 (22:34)
23 Responses
Last Response: Oct 10 2022 (22:34)
#SuratMetro.
J Kumar Infra's 1 of 2 TBM assembled in Palanpur for constructing 3.56 km underground Pkg between Surat Railway Station and Chowk Bazar Ramp. TBM was earlier used for Delhimetro for Phase 3. The TBM was refurbished over 6 month period
©️Aakash Tanwar
J Kumar Infra's 1 of 2 TBM assembled in Palanpur for constructing 3.56 km underground Pkg between Surat Railway Station and Chowk Bazar Ramp. TBM was earlier used for Delhimetro for Phase 3. The TBM was refurbished over 6 month period
©️Aakash Tanwar
1 Public Posts - Fri Jan 21, 2022
1 Public Posts - Wed Jan 26, 2022
#Surat Metro Line-2's first tender notice is out.
GMRC has invited bids to construct its 10.559 km Bhesan – Adajan – Majura Gate section with 11 elevated stations
Sourcr- The Metro Rail Guy
GMRC has invited bids to construct its 10.559 km Bhesan – Adajan – Majura Gate section with 11 elevated stations
Sourcr- The Metro Rail Guy
2 Public Posts - Sun Jan 30, 2022
1 Public Posts - Tue Feb 01, 2022
1 Public Posts - Mon Feb 14, 2022
6 Public Posts - Thu Feb 24, 2022
9 Public Posts - Wed Sep 21, 2022
1 Public Posts - Mon Oct 10, 2022