Search Forum
Blog Entry# 5249944
Posted: Mar 22 2022 (08:21)
19 Responses
Last Response: Jul 01 2022 (19:01)
19 Responses
Last Response: Jul 01 2022 (19:01)
Bhimsen - khairar doubling update
Yamuna new rail bridge construction start
Yamuna new rail bridge construction start
15 Posts
Trains don't reverse at KID bcoz KID doesn't have staff for this and only 1 low level platform available at KID station. Loco reversal happens at BNDA station. BNDA provide good occupancy to each trains in JHS-MKP, CNB-STA, KURJ-CNB.
After KID bypass BNDA passengers will go to Mataundh or Ichauli to cath the train then both side distance will be 20 KM.
Without wasting almost 1.30 hour journey time and Loco reversal @Banda.
Khairar chord line is very necessary to get the direct connectivity of Mahoba to Kanpur, Lucknow and beyond.
Khairar chord line is very necessary to get the direct connectivity of Mahoba to Kanpur, Lucknow and beyond.
As 2 sections namely, CNB JHS and CNB BNDA are getting doubled, it is more of important for GOY BZM to be quadrupled. Else trains will be stuck @ BZM. Jaise 2020, k phele GOY pe hoti thi until through line came up bur thoda bht abhi hoti hai.
.
I remember, it was shayd 2008/09/10 jab GOY BZM was getting doubled, as i was stuck at crossing 🚸 and we had some exam or something.
.
I remember, it was shayd 2008/09/10 jab GOY BZM was getting doubled, as i was stuck at crossing 🚸 and we had some exam or something.