Search Forum
Blog Entry# 5253847
Posted: Mar 26 2022 (13:39)
18 Responses
Last Response: Mar 30 2022 (11:48)
18 Responses
Last Response: Mar 30 2022 (11:48)
#Mahbubnagar to #kacheguda #Doubling and #electrification Completed on March 30th #SCR #Raichur #Kurnool
2 Public Posts - Sat Mar 26, 2022
5 Public Posts - Sun Mar 27, 2022
5 Public Posts - Mon Mar 28, 2022
4 Public Posts - Tue Mar 29, 2022
1 Public Posts - Wed Mar 30, 2022
If your native is near GTL/BAY, why are you vouching for KRNT-VSKP train instead of GTL-VSKP train ? Just kidding 😊😂😂
LC doesn't require much time but the complex layout of GTL station is the matter of concern. Since you know GTL from MG era , I hope you know very well how old building was situated between BG and MG lines. After GC, all lines / PFS have not been linked. Hopefully with linking of all lines as part of GNT-GTL doubling project and with completion of by-pass line connecting...
more...
LC doesn't require much time but the complex layout of GTL station is the matter of concern. Since you know GTL from MG era , I hope you know very well how old building was situated between BG and MG lines. After GC, all lines / PFS have not been linked. Hopefully with linking of all lines as part of GNT-GTL doubling project and with completion of by-pass line connecting...
more...