Search Forum
Blog Entry# 5254984
Posted: Mar 27 2022 (16:32)
8 Responses
Last Response: Mar 28 2022 (18:28)
8 Responses
Last Response: Mar 28 2022 (18:28)
Transfer of Electric Locos
⚡1-WAP7 Transferred from Gonda DLS to BRC ELS
⚡3-WAP7 Transferred from Gonda DLS to GZB ELS
⚡4-WAP7 Transferred from Gonda DLS to Kalyan ELS
⚡3-WAP7 Transferred from Gonda DLS to RPM...
more...
⚡1-WAP7 Transferred from Gonda DLS to BRC ELS
⚡3-WAP7 Transferred from Gonda DLS to GZB ELS
⚡4-WAP7 Transferred from Gonda DLS to Kalyan ELS
⚡3-WAP7 Transferred from Gonda DLS to RPM...
more...
8 Posts
Now with whole section Chennai/Bangalore/Hyd-Mumbai totally electrified.... all trains will start running with elocos end to end.... So.. more locos will be required at Kalyan, RPM and even LGD, KJM as well.
I guess that is the reason for this transfer. Not sure though..
I guess that is the reason for this transfer. Not sure though..
Count Erode as well. This doesnt have anything to do with the electrification of the CR sections. If thats the case, all the locos should have gone to KYN/AQ. Moreover, many trains are already getting eloco end to end. Its just that diesel topup method will stop. The reason must be specifically related to Gonda DLS in particular.