Search Forum
Blog Entry# 5274482
Posted: Apr 06 2022 (18:47)
10 Responses
Last Response: Apr 10 2022 (15:06)
10 Responses
Last Response: Apr 10 2022 (15:06)
Apr 06 2022 (18:47) IMG12235-1963210/♥♥Mumbai CSMT - KSR Bengaluru Weekly SF Express♥♥ (PT)
4426 net green flags 4 green per TrainCustom Ratings
HarshaI22159^~
HarshaI22159^~ 1635 img trains 305 popular4426 net green flags 4 green per TrainCustom Ratings
Now that Pune Solapur Section is electrified, i feel like there should be an upgraded version of Udyan Express, this has RSA with my LTT Secunderabad Weekly SF, please flag and suggest changes!
5 Posts
1. Speed up the train - LTT -SBC should be able to do in 17 .5 hours. Buses dont require 19 hours.
2. Change the route after DMM - Let it come via Hindupur-Yelahanka and take bypass line at Channasandra and either terminate at KJM or take a halt at Bengaluru Cantt and terminate at SBC. You dont need to route it via YPR since it is already a destination for trains and you will eventually slow down the train even more.
2. Change the route after DMM - Let it come via Hindupur-Yelahanka and take bypass line at Channasandra and either terminate at KJM or take a halt at Bengaluru Cantt and terminate at SBC. You dont need to route it via YPR since it is already a destination for trains and you will eventually slow down the train even more.
Don't expect that electrification speeds up trains, it's a total foolish thing