Search Forum
Blog Entry# 5310137
Posted: Apr 19 2022 (18:09)
5 Responses
Last Response: Apr 19 2022 (23:06)
5 Responses
Last Response: Apr 19 2022 (23:06)
The slack towards the end of the journey has been reduced and revised arrival time at Ernakulam is 1:55am at terminating station !! This is with effect from 14-April ( train that left Tata on 14-April).
Adding to the already existing inconvenient time, this has only added to the pain for passengers deboarding at Ernakulam.
Kindly make the required changes with regard to arrival time at ERS.
Adding to the already existing inconvenient time, this has only added to the pain for passengers deboarding at Ernakulam.
Kindly make the required changes with regard to arrival time at ERS.
Still this change in time is not reflecting in IRCTC. Once irctc updated, the TT will be updated here
Still no use. Also they have to divert this via VSKP. That is also pending
VJA to Gudur 6.50Hrs they can reduce the run time to 4.20hrs. 2.5hrs perambur to podanur 30mins can ve reduced DVD to BZa 30-60mins can be reduced. On the entire run atleast 4 hrs can be reduced.
The SCR will reduce the running time by 20 minutes and gives a news paper statement in this way:
ERNAKULAM EXP SPEEDED UP
ERNAKULAM EXP SPEEDED UP
Yes. Quite a few things pending. Stoppage at VSKP is top priority. Passengers from Tata have ended up losing the only daily connectivity to VSKP. Current time is very inconvenient. There was also talk of stoppage at CBE. In return direction regularly reaches Podanur 40-45 min before time and ends up halting for almost an hour. Easily can be sent to CBE as connectivity is much better compared to CBE. Also lot of slack between SBP-JSG section. Overall a better TT can be easily explored for this train