Search Forum
Blog Entry# 5333733
Posted: May 04 2022 (16:51)
4 Responses
Last Response: May 04 2022 (20:27)
4 Responses
Last Response: May 04 2022 (20:27)
Both MAS-CBE and MS-MDU are FEDL.
12673 MAS-CBE Cheran takes 8 hours to reach 495 Kilometers with 6 halt whereas
12637 MS-MDU Pandiyan takes 7 hours 45 minutes to reach 493 kilometers with 9 halts... is it due to speed limit or any other reason.
12673 MAS-CBE Cheran takes 8 hours to reach 495 Kilometers with 6 halt whereas
12637 MS-MDU Pandiyan takes 7 hours 45 minutes to reach 493 kilometers with 9 halts... is it due to speed limit or any other reason.
Both r different sections, both have different PSR/TSRs enroute so u can't compare both.
MAS-CBE: TVC mail takes very less time in this section 6 Hrs 52 Mins.
MS-MDU: The fastest Exp/SF train (Quilon Mail) 7Hrs 10 Mins.
Over a period of time MAS-CBE trains have been slowed down.
MS-MDU: The fastest Exp/SF train (Quilon Mail) 7Hrs 10 Mins.
Over a period of time MAS-CBE trains have been slowed down.
Thanks.. that's why i got doubt, where as TVC mail able to reach CBE with less than 7 hours, why prestigious train like Cheran takes 8 hours
20-30 Mins could be buffer for final destination. It can be speeded up.
Kovai once was fastest SF in SR along with TN. Now both are slowed down and i think Vaigai picked up that spot. Thanks.
Kovai once was fastest SF in SR along with TN. Now both are slowed down and i think Vaigai picked up that spot. Thanks.