Search Forum
Blog Entry# 5355785
Posted: May 24 2022 (20:46)
7 Responses
Last Response: May 25 2022 (00:13)
7 Responses
Last Response: May 25 2022 (00:13)
May 24 2022 (20:46) DURG/Durg Junction (6 PFs) | SRC/WAP-7/37591
SHUBHAMKUMAR~
SHUBHAMKUMAR~ 1194 blog postsSpotted 37591 SRC WAP7 with COCR Special with SER rake at Pitline of Durg Junction.
The COCR Rake formation includes:-
Humsafar EOG
1st AC (21 made)
3rd...
more...
The COCR Rake formation includes:-
Humsafar EOG
1st AC (21 made)
3rd...
more...
2 Posts
Yes the BSP - Durg section High speed COCR trial run was done. Soon to be upgrade to 130.
COCR is a High speed trial run for the section upgrade. The main aim is to upgrade the speed of train from 110 to 130 in section.
This is done with the help of LHB rake consists of 24 coaches which includes all coach like 1ac 2nd ac, 3ac, Pantry car, Sleeper coach, Gen coach with EOG.
This is done with the help of LHB rake consists of 24 coaches which includes all coach like 1ac 2nd ac, 3ac, Pantry car, Sleeper coach, Gen coach with EOG.
Even if upgrades do occur, unless the punctuality of trains in JSG-BSP section increases, there won't be much advantage for trains coming from HWH side. Once this section used to witness flat 110 kmph runs but now it has completely changed into a freight section, with trains getting more than an hour behind schedule on a regular basis