Search Forum
Blog Entry# 536315
Posted: Sep 27 2012 (12:11)
4 Responses
Last Response: Sep 27 2012 (12:21)
4 Responses
Last Response: Sep 27 2012 (12:21)
Wonder why SR is not operating trains via SA-KRR.. the route is ready and operational. Safety checks are over and goods trains are running. Still SR does all the spl trains via SA-ED-TPJ, with loco change at ED. That will drastically reduce the running time of these trains and poor Southern TN people..
1 Public Posts - Thu Sep 27, 2012
2 Public Posts - Thu Sep 27, 2012