Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Sapt Kranti Express: Ruling the tracks with EMD Power - Keshav Singh

Search Forum
<<prev entry    next entry>>
Blog Entry# 5367942
Posted: Jun 05 2022 (11:04)

7 Responses
Last Response: Jun 08 2022 (06:56)
General Travel
53062 views
6

Jun 05 2022 (11:04)   17315/Vasco-Da-Gama - Velankanni Weekly Express | VSG/Vasco-da-Gama (3 PFs)
LHB_for_18047~
LHB_for_18047~   10661 blog posts
Entry# 5367942            Tags  
Permanent augmentation of 2 AC three tier coaches.
Source: twitter.
Translate to English
Translate to Hindi

3 Posts

32470 views
0

Jun 05 2022 (12:21)
KoushikPatel~
KoushikPatel~   2091 blog posts
Re# 5367942-4              
The way they have added 2 more 3AC, looks like standard SWR LHB rakes with 7 AC and 7 SL
Translate to English
Translate to Hindi

30227 views
0

Jun 05 2022 (12:34)
LHB_for_18047~
LHB_for_18047~   10661 blog posts
Re# 5367942-5              
Amaravati needs to be run with 21 LHB rake now it's high time also the ICF rake is in bad condition i saw at VSG last month. Slip needs to go now.
They should utilise the rake of VSG NGT and restart VSG MAS via GTL RU and cancel the VSG TPTY link and run VSG HYB full rake and cancel the KCG VSG slip.
Translate to English
Translate to Hindi

30299 views
0

Jun 05 2022 (12:35)
LHB_for_18047~
LHB_for_18047~   10661 blog posts
Re# 5367942-6              
Nope. Next year most probably. Even the chances of Goa express getting LHB are looking doubtful now.
Translate to English
Translate to Hindi

30858 views
0

Jun 05 2022 (12:36)
LHB_for_18047~
LHB_for_18047~   10661 blog posts
Re# 5367942-7               Past Edits
Standardization done with ICF rake itself they should add a PC to this train too. And instead of idling the rake for 4 days at SVM/VSG should restart VSG MAS weekly with RSA.
It's already running with 2 AC three tier coaches on temporary basis as of now marked at BE1 and BE2. After temporary augmentation is over those two will be renamed as B5 and B6. No LHB here.
Translate to English
Translate to Hindi

34432 views
0

Jun 08 2022 (06:56)guest
Re# 5367942-8              
#permanentaugmentation means no chance in near future of lhb
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy