Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

यमला-पगला-ट्रेन का-दिवाना - कार्तिक

Search Forum
<<prev entry    next entry>>
Blog Entry# 541100
Posted: Oct 03 2012 (08:04)

7 Responses
Last Response: Oct 05 2012 (00:56)
Greetings
4093 views
3

Oct 03 2012 (08:04)   12723/Telangana Express (PT)
 
DrPraveen
DrPraveen   624 blog posts
Entry# 541100            Tags  
"HAPPY BIRTHDAY DEAR ANDHRA PRADESH EXPRESS"
36yrs back, on the same day, this train was flagged off by Madhu Dandavate in 1976...

Originally covering the distance in a shade under 23 hrs in 1978, the passage of time has seen the running time being increased. When this train was introduced many of the important sections were single-line territory, almost 300 km in a
...
more...
total of 1670 km. The signalling in 1978 was semaphore. When introduced, the 14-coach train was pulled by a 2600 HP ALCO derived diesel locomotive - WDM2 nomenclature for Indian Railways. In 1981 the capacity was increased to 21 coaches with a double head of 2 ALCO (WDM2) derived locomotives with 5200 HP. This double-headed power pulled the train up and down the hilly sections (with 1:63 gradient) between ITARSI and NAGPUR - a distance of 300 km. The train originally had a fully equipped pantry car.

Today the train with 24 coaches (including 7 AC coaches) is pulled by electric locomotives (WAP 1 / WAP4 or even WAP-7) throughout the double line electrified section with modern concrete sleepers. The signalling is electronic and the drivers use radios to maintain communication with controllers, but the running time continues to increase. As of 26 April 2010, the train is pulled by WAP7 from LALLAGUDA SHED throughout the journey. The other trains going through the Northern Plains have been allocated WAP5 and WAP7 locomotives - traversing through not so hilly regions, but this train going mostly through 1:100 gradients. Since its commissioning in 1978 to early 1990s there were just five stops in its journey - Jhansi, Bhopal, Nagpur, Balharshah and Kazipet, but several intermediate stops have since been added; the present run time is more than 27 hours.

Translate to English
Translate to Hindi

4 Public Posts - Wed Oct 03, 2012

2304 views
0

Oct 03 2012 (18:41)
balajiSunder~
balajiSunder~   1857 blog posts
Re# 541100-5              
also has cbc couplings
Translate to English
Translate to Hindi

1 Public Posts - Wed Oct 03, 2012

1 Public Posts - Fri Oct 05, 2012
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy