Search Forum
Blog Entry# 5433888
Posted: Aug 02 2022 (13:48)
4 Responses
Last Response: Aug 02 2022 (19:47)
4 Responses
Last Response: Aug 02 2022 (19:47)
Can anyone tell how many washing lines available in ghazipur city with any available stop for primary maintenance.
6 Posts
1 only
Capacity of 26 LHB coacher and two 12 coacher icf at a single time PM is available
But no PM & SM happens there as tender was never invited for that..
After 2019 the CDO didn't get anything
No...
more...
Capacity of 26 LHB coacher and two 12 coacher icf at a single time PM is available
But no PM & SM happens there as tender was never invited for that..
After 2019 the CDO didn't get anything
No...
more...
Depends that the train is getting extended to Ghazipur has PM to previous station or not
Like if u extend marudhar they will OEM or SM any of which needed or if u extend 12581 type train then PM is needed at GCT
Well looks like GCT will get nothing as of now
Like if u extend marudhar they will OEM or SM any of which needed or if u extend 12581 type train then PM is needed at GCT
Well looks like GCT will get nothing as of now