Search Forum
Blog Entry# 5454358
Posted: Aug 19 2022 (16:13)
9 Responses
Last Response: Aug 19 2022 (16:29)
9 Responses
Last Response: Aug 19 2022 (16:29)
Aug 19 2022 (16:13) IMG22540-106541/♥♥Gorakhpur - Chhatrapati Shivaji Maharaj Terminus Tejas (Push-Pull)♥♥ | GKP/Gorakhpur Junction (10 PFs)
644 net green flags 7 green per TrainCustom Ratings
PKSNER~
PKSNER~ 102 img trains 50 popular644 net green flags 7 green per TrainCustom Ratings
The fastest train between GKP and Mumbai which will only take 24 hours to complete the whole journey with a practical speed between the stations, minimum stoppage after crossing CNB, as there are many train from VGLB, BPL route to Mumbai.
4 Posts
The originating platform of Dadar can't handle 18+ Coaches, the mainline platforms can handle
Accha, ap rake maintenance pit length ki baat kar rahe hai kya bhai?
woh to alag se yaar, lekin point is, ki jo trains Dadar se shuru ho rhi hai, unka length sirf 18 Coaches hi hai, prime example is 12163, jab wo Dadar se shuru hoti ti tab usme sirf 18 Coaches hi the, ab kyuki wo LTT se shuru ho rhi hai isiliye usko 18+ Coaches mile, aur waise bhi ye Duronto hai, better hai ki aap isko LTT Shift kro, waha pe waise bhi better maintenance facilities hai Dadar se for a train like Duronto