Search Forum
Blog Entry# 5471059
Posted: Sep 08 2022 (08:24)
No Responses Yet
No Responses Yet
New Facilities/Technology
CMRL/Chennai Metro
karbang~ 1804 news posts
A pair of tunnel boring machines, S97 and S98, arrived at Chennai Port to begin work on the 118.9 km Chennai Metro Phase 2 line.
...
Swarajya Chennai Metro Gets Two New Tunnel Boring Machines; To Begin Work On 9 Km Long Twin Tunnel In October Latest Articles About Swarajya Useful Links Participate Stay Connected
...
Swarajya Chennai Metro Gets Two New Tunnel Boring Machines; To Begin Work On 9 Km Long Twin Tunnel In October Latest Articles About Swarajya Useful Links Participate Stay Connected