Search Forum
Blog Entry# 5534083
Posted: Nov 03 2022 (00:09)
5 Responses
Last Response: Nov 21 2022 (15:51)
5 Responses
Last Response: Nov 21 2022 (15:51)
Another Offlink Pune Howrah Azad Hind Express with AJJ WAP4 22902 going through Santragachi
Bcz in that time the Shunting duty is going on its rear panto from oposite side
As far as I know, the electric loco was not shunting at all, not even in the reverse mode. It was just attached along with the entire rake. That's how trains from SRC yard generally get shunted to HWH (& also get shunted back from HWH to SRC yard).
The shunting duty is generally done by KGP based ALCos or EMDs, which always get connected at the front of the rake.
The shunting duty is generally done by KGP based ALCos or EMDs, which always get connected at the front of the rake.