Search Forum
Blog Entry# 5556770
Posted: Nov 27 2022 (15:03)
2 Responses
Last Response: Nov 27 2022 (20:43)
2 Responses
Last Response: Nov 27 2022 (20:43)
According to CMS report of freight train, the speed of train in NCB-GKJ section increased and reached to 84 kmps though MPS is 75 kmps.(58 km run in 41 minutes)
So, moderator/monitor sir ..plz consider the matter and increase the MPS of this section if necessary.
A screenshot of freight train given below..
Thanks
So, moderator/monitor sir ..plz consider the matter and increase the MPS of this section if necessary.
A screenshot of freight train given below..
Thanks