Construction of Broad-Gauge Line between Himmatnagar (HMT Kms. 01.000) (Including) to
Khedbrahma (KDBM Kms. 55.168) (Including) (54.168 km) covering all Civil Engineering
works (i. e. Earthwork, Blanketing, Side Drains, Retaining Wall, Construction of all Important/
Major / Minor Bridges, ROB/RUBs / LHS, Level Crossings, Complete Track works, Ballast
Supply...
more...
Khedbrahma (KDBM Kms. 55.168) (Including) (54.168 km) covering all Civil Engineering
works (i. e. Earthwork, Blanketing, Side Drains, Retaining Wall, Construction of all Important/
Major / Minor Bridges, ROB/RUBs / LHS, Level Crossings, Complete Track works, Ballast
Supply...
more...
1 Public Posts - Thu Dec 01, 2022
Isko aage Taranga Hill - Ambaji se connect kare tabhi jyada useful ho payegi... Nahi toh only 1-2 passenger trains hi milegi...
1 Public Posts - Thu Dec 01, 2022
1 Public Posts - Fri Dec 02, 2022
1 Public Posts - Sun Dec 11, 2022
1 Public Posts - Mon Dec 12, 2022
1 Public Posts - Tue Dec 13, 2022