Search Forum
Blog Entry# 5561894
Posted: Dec 03 2022 (13:57)
1 Responses
Last Response: Jan 23 2023 (21:32)
1 Responses
Last Response: Jan 23 2023 (21:32)
CRS Inspection for re-opening of Nalikul-Singur regraded section (in connection with DKAE-CDAE 4th line project) conducted on 23.01.2023. Line opened for passenger traffic after 3hrs of inspection.