Search Forum
Blog Entry# 5563796
Posted: Dec 05 2022 (20:14)
1 Responses
Last Response: Mar 03 2023 (20:32)
1 Responses
Last Response: Mar 03 2023 (20:32)
Signal malfunctioning, a common issue during Non #interlocking work @Chandanpur
Pic 1 case study: About to be dismantled, Up Chord line starter (with X board) shows yellow aspect, just behind it, the soon to be comissioned new Up chord starter showing red aspect. CRS train(WAP7 front/WDM3D back) has proceeded till Advanced starter to reverse back into loop line.
Pic...
more...
Pic 1 case study: About to be dismantled, Up Chord line starter (with X board) shows yellow aspect, just behind it, the soon to be comissioned new Up chord starter showing red aspect. CRS train(WAP7 front/WDM3D back) has proceeded till Advanced starter to reverse back into loop line.
Pic...
more...
Signal malfunctioning : a common issue during Non #interlocking work @Singur
Case: Up main starter signal could be taken OFF inspite of two L/C gates still open.
#signalmalfunction
Case: Up main starter signal could be taken OFF inspite of two L/C gates still open.
#signalmalfunction