Search Forum
Blog Entry# 5566190
Posted: Dec 08 2022 (17:04)
7 Responses
Last Response: Dec 09 2022 (19:21)
7 Responses
Last Response: Dec 09 2022 (19:21)
Dec 08 2022 (17:04) 22701/Visakhapatnam - Guntur UDAY Express
venkat_vskp~
venkat_vskp~ 6449 blog postsExtension to guntur approved. Not really required extension. May run more than half empty from BZA - GNT. Should have extended to OGL or NLR
2 Posts
then later its extended to SC means ? if two rakes are there better extend now
Extention is just to avoid PF occupancy at Vja and Guntur willing to provide PF for 4.5hrs. As Guntur has trip shed the loco crew allotment is also easy and need not change at Vijayawada or provide crew gor short distance.
Extension should have been to NLR by utilizing 130 kmph advantage. Instead of dumping.
You are over optimistic about 130kmph but in reality SCR schedules are mess everyday. Every train is reaching 30 to 60 mins delay at SC. I have travelled twice to Hyd in last 45 days and observing the positions every other day. On Monday duronto took nearly 5 hrs 40 mins to reach Vskp from BZA. They should complete BZA DVD in 4.5hrs and leave to Vskp whether they taken or not.