Search Forum
Blog Entry# 5567233
Posted: Dec 09 2022 (20:20)
54 Responses
Last Response: Dec 11 2022 (14:31)
54 Responses
Last Response: Dec 11 2022 (14:31)
Trip Started: Fri Dec 09 by Globetrot
0 | updating ... |
The train left NDLS exactly on time. 1A coach is clean, one seat coming on at Jhansi tonight, and 2 seats getting off at Kopargaon in the Coupe H. Our WAP7 had some power issues, and first the HOG was switched off, then the entire engine was replaced by a WAG9! All pics of the trip here https://photos.app.goo.gl/efJLbYpeNtoVqQDp6
9 Public Posts - Fri Dec 09, 2022
27 Public Posts - Sat Dec 10, 2022
@RRI 8 km <--> 5 km @VBR 35m late
@VBR: Vambori &101 km/h surprised to see it's still a single line here. But work is going on all the way, I'm guessing doubling will be done in a year or two.
@VBR: Vambori &101 km/h surprised to see it's still a single line here. But work is going on all the way, I'm guessing doubling will be done in a year or two.
7 Public Posts - Sat Dec 10, 2022
10 Public Posts - Sun Dec 11, 2022