Search Forum
Blog Entry# 5570436
Posted: Dec 13 2022 (13:10)
1 Responses
Last Response: Dec 13 2022 (15:11)
1 Responses
Last Response: Dec 13 2022 (15:11)
Dec 13 2022 (13:10) SRC/Santragachi Junction (6 PFs)
ShashankSwain99^~
ShashankSwain99^~ 5655 blog posts#Tender
Consultancy Services for Detailed Project Report and Detailed Design Consultancy in connection with Execution of Final Location Survey, Soil Investigation, Preparation Yard Plans, Slope Stability Analysis and Submission of Various Detailed Design & Drawings for proposed 4th line between Santragachi and Kharagpur (109 Km) under the jurisdiction of Dy CE/Con/Garden Reach of S. E. Railway. Estimate No. 1/FLS-SUR/2022.
.................
Approx....
more...
Consultancy Services for Detailed Project Report and Detailed Design Consultancy in connection with Execution of Final Location Survey, Soil Investigation, Preparation Yard Plans, Slope Stability Analysis and Submission of Various Detailed Design & Drawings for proposed 4th line between Santragachi and Kharagpur (109 Km) under the jurisdiction of Dy CE/Con/Garden Reach of S. E. Railway. Estimate No. 1/FLS-SUR/2022.
.................
Approx....
more...