Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal Android   RailCal iPhone

site support

Kolkata Local - আমি তোমাকে ভালবাসি

Search Forum
<<prev entry    next entry>>
Blog Entry# 5574315
Posted: Dec 17 2022 (11:05)

6 Responses
Last Response: Dec 17 2022 (14:28)
Info Update
63821 views
3

Dec 17 2022 (11:05)   SCE/Senchoa Junction (1 PFs)
guest
Entry# 5574315            Tags   Past Edits
Statutory inspection of RE works followed by speed trial at full sectional speed (75 Kmph) in Senchoa - Silghat Town (61 RKM/64.3 TKM)single line section of Lumding Division of NFR completed successfully. With this, total commissioning by CORE during 2022-23 is 1435.6 RKM/1982.8TKM
Translate to English
Translate to Hindi

4 Public Posts - Sat Dec 17, 2022

10645 views
0

Dec 17 2022 (12:05)
Asis~   1001 blog posts
Re# 5574315-6              
@5574315-5  @guest
At least till Lumding Jn to get electrified by 2022-23. So that LC can be possible at Lumding Jn instead of Ghy.
Translate to English
Translate to Hindi

1 Public Posts - Sat Dec 17, 2022
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy