Dec 17 2022 (13:04) 16528/Kannur - Yesvantpur Express (PT) | CAN/Kannur (Cannanore) (4 PFs)
MCPNBR~
MCPNBR~ 4911 blog posts4 Posts
The delay still continues, by the time reaches SA the delay is between one to two hours and continues thereafter. Withheld at many places for unknown reason.
Not seen any doubling near BYPL cabin, still to connect to BYPL
Not seen any doubling near BYPL cabin, still to connect to BYPL
Yes correct. Handover from PGT to Salem division is on time. From 1-Dec onwards speed restrictions have been imposed between PGT Podanur for night trains. Amongst trains surprisingly 16528 has been allotted the least time as per TT. Reaches late at CBE &all stations till Salem. Handed over late to SWR. From there on due to single line keeps getting delayed. Also Pf at Heelalige has been dismantled so again some restrictions
Maybe due to elephant🐘 corridor. But still the delay increases after CBE also and not able to make up the delay.
After Slem in single line section it is very difficult to make up for time due to single line section. even there especially between DPJ till CRLM, I think speed restrictions are there at multople places. Not sure if trains are allowed 100km/hr ,mps in this stretch. Unless and until doubling happens in this route , dont think running time will improve. Also distances between stations is also more