Search Forum
Blog Entry# 5576813
Posted: Dec 19 2022 (22:05)
1 Responses
Last Response: Dec 20 2022 (04:56)
1 Responses
Last Response: Dec 20 2022 (04:56)
Can anyone tell me criteria of primary and secondary maintenance of a lhb and icf rakes train?
For LHB trains PM 4000km run. If one way distance travelled is more then 2000km then at destination SM should be done before return departure. For ICF trains the distance is 3000km for PM and 2000km for SM.