Search Forum
Blog Entry# 5577433
Posted: Dec 20 2022 (14:53)
1 Responses
Last Response: Dec 20 2022 (15:02)
1 Responses
Last Response: Dec 20 2022 (15:02)
#Tender
Conducting Final Location Survey, Traffic survey, submission of comprehensive DPR for all civil, electrical and S&T work, preparation of detail estimate along with Alignment Plan, Yard Plan, drawing for minor bridges, major bridges, ROB/RUB, FOB, level crossing drawings, Hydrological & Geotechnical Investigation and all other ancillary works for (A) Flyover at A-cabin of Bondamunda (Item No. 31) (5.0 Km); (B) Flyover Padphar /Dongoaposi down grid to Dongoaposi 3rd line/Joint line (5.0 Km) (Item No. 28); (C) Flyover Up grid of Adityapur-Gamharia section to Birarajpur (Item No. 28) (5.0 Km); (D)...
more...
Conducting Final Location Survey, Traffic survey, submission of comprehensive DPR for all civil, electrical and S&T work, preparation of detail estimate along with Alignment Plan, Yard Plan, drawing for minor bridges, major bridges, ROB/RUB, FOB, level crossing drawings, Hydrological & Geotechnical Investigation and all other ancillary works for (A) Flyover at A-cabin of Bondamunda (Item No. 31) (5.0 Km); (B) Flyover Padphar /Dongoaposi down grid to Dongoaposi 3rd line/Joint line (5.0 Km) (Item No. 28); (C) Flyover Up grid of Adityapur-Gamharia section to Birarajpur (Item No. 28) (5.0 Km); (D)...
more...