Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

NZM-Kota Jan Shatabdi: एवरेज स्पीड में नंबर वन, जिसमें नहीं है सवारियों का टोटा, यह है आपणी जनशताब्दी From कोटा - Madan Mohan Meena

Search Forum
<<prev entry    next entry>>
Blog Entry# 5603684
Posted: Jan 17 2023 (10:23)

66 Responses
Last Response: Jan 28 2023 (09:46)
General Travel
124692 views
10

Jan 17 2023 (10:23)   GTL/Guntakal Junction (7 PFs)
PBPJVK~
PBPJVK~   1341 blog posts
Entry# 5603684            Tags  
3 compliments
Great Great Useful
VB Trains from SC -BZA, SC-TPTY, SC-SBC runs soon.
Translate to English
Translate to Hindi

61 Posts

14546 views
2

Jan 27 2023 (12:09)
RanvirSiddhanth~
RanvirSiddhanth~   1686 blog posts
Re# 5603684-62              
Number of trains may be less. But it cannot handle all the trains in all the platforms. It has specific platforms for specific routes. That is the drawback with it. If all the lines are merged then rush will be reduced
Translate to English
Translate to Hindi

12807 views
0

Jan 27 2023 (12:45)
PBPJVK~
PBPJVK~   1341 blog posts
Re# 5603684-63              
Yes dude. 3+4platforms are there. I agree with you.
Translate to English
Translate to Hindi

11374 views
1

Jan 27 2023 (14:18)
kkk970
kkk970   60 blog posts
Re# 5603684-64               Past Edits
This problem can be cleared by demolishing old booking counter and parcel buildings and then laying new tracks with Modified alignment so that trains coming from Gpu route can directly enter atleast upto platform 5 or even 6.Trains from Bay/ Rc /Dhne route Going towards Gpu side in future can enter all the way upto platform 5/6 . This can decongest platform 1,2,3 at peak hrs.
Translate to English
Translate to Hindi

8173 views
0

Jan 28 2023 (09:08)
PBPJVK~
PBPJVK~   1341 blog posts
Re# 5603684-65              
But railways having not interest in demolishing old building. To remove this problem they are constructing bypass line into the junction from Mallappagate(DHNE-GTL track) to Guntakal Jn(RC-GTL track). They may demolish this after 20-30yrs but now no hope. Dude.
Translate to English
Translate to Hindi

7797 views
0

Jan 28 2023 (09:46)
RanvirSiddhanth~
RanvirSiddhanth~   1686 blog posts
Re# 5603684-66              
Best example of congestion is all the two amaravati express and prasanthi exp come around 5 am. And also slip coaches for these trains attachment and detachment is also there. So here lot of time waste as prasanthi loco need to be reversed
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy