Search Forum
Blog Entry# 5627918
Posted: Feb 11 2023 (00:02)
1 Responses
Last Response: Feb 11 2023 (11:59)
1 Responses
Last Response: Feb 11 2023 (11:59)
After 3 trains running with HRP Electric Loco WR should also consider for rescheduling timing of train halts at ADI. Instead of 20-35mins it can be 10mins
Thats correct, trains like 22965/66 are having a slack of minimum 1 hr with diesel engine. If it is being hauled by eloco then there should be a saving of 1.5 hrs to 2 hrs. This train can easily do BGKT-Ju run in less than 13 hrs which will increase the patronage of this train.