Search Forum
Blog Entry# 5634112
Posted: Feb 16 2023 (13:37)
No Responses Yet
No Responses Yet
Feb 16 2023 (13:37) Varanasi - Lucknow SF Shuttle Express/20401 Train - News
Rohit LKO BUI
ArmyRF^~ 4497 Conf TLs 194 Void TLsNews Entry# 0
Due to surrendering of Gular yd L. no. 1, 2 & 3 and washing line 1(Capacity-26 Coaches), stabling of rakes & Primary maintenance of trains at BSB will suffer. PM to be shifted to LKO instead of BSB with reduction of load up to 18 Coaches ICF (Composition- SLR-2, CZAC-4, GS-12).
Due to surrendering of Gular yd L. no. 1, 2 & 3 and washing line 1(Capacity-26 Coaches), stabling of rakes & Primary maintenance of trains at BSB will suffer. PM to be shifted to LKO instead of BSB with reduction of load up to 18 Coaches ICF (Composition- SLR-2, CZAC-4, GS-12).
News Entry# 0
Temporary Augmentation of 2 General Class Coaches & 1 AC Chair Cars from 01.12.2022 to 31.12.2022 Only
After That CC of Train Will Be General Class 15 General Class, 4 AC Chair Car & 02 SLR = Total 21 Coaches from 01.12.2022 to 31.12.2022 only