Search Forum
Blog Entry# 5677107
Posted: Mar 26 2023 (14:50)
1 Responses
Last Response: Mar 26 2023 (14:52)
1 Responses
Last Response: Mar 26 2023 (14:52)
DRM/TSK along with ADSO/TSK on 25.03.2023 conducted night inspection at Simaluguri station and LC gate ST-116 SPL. Existing amenities, safety installations were inspected as well as staff dealing with train operation were counselled during the occasion.
Source: DRM TSK Twitter Handle
Source: DRM TSK Twitter Handle