Search Forum
Blog Entry# 5685581
Posted: Apr 05 2023 (18:46)
7 Responses
Last Response: Apr 15 2023 (06:53)
7 Responses
Last Response: Apr 15 2023 (06:53)
Apr 05 2023 (18:46) Karnataka Sampark Kranti Express (Via Ballari) (PT)/12650 Train - LocoVinusai^~ 1373 Conf TLs 58 Void TLs
Attach: LGD/WAP-7 NZM/Hazrat Nizamuddin->UBL/SSS Hubballi Junction (Hubli)
Attach: GTL/WDM-3D/twins KCG/Kacheguda->YPR/Yesvantpur Junction
2 Posts
By the way full route is eletrified then why SCR or SWR are not giving electric traction
SBC-BAW-UBL route is having only UP line electrified, DN line electrificafion is still pending.
6 TSS is left to energize.
Coming to KCG-DHNE route, 11 pairs of training have recieved end to end electric locos in which 10 used to have diesel loco top-up and 1 train got traction change from diesel to electric i.e MYS-JP Exp.
...
more...
6 TSS is left to energize.
Coming to KCG-DHNE route, 11 pairs of training have recieved end to end electric locos in which 10 used to have diesel loco top-up and 1 train got traction change from diesel to electric i.e MYS-JP Exp.
...
more...
SBC to Saunshi both the lines are electrified. Saunshi to SUBL only up line is electrified. Plus all loop lines wiring is pending between AVC to SUBL