Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

For a RailFan, watching MPS skips are far more interesting than watching F1 race - Prince Maan

Search Forum
<<prev entry    next entry>>
Blog Entry# 5696672
Posted: Apr 17 2023 (11:30)

15 Responses
Last Response: Apr 18 2023 (13:24)
General Travel
188852 views
13

★★
Apr 17 2023 (11:30)   12779/Goa Express (PT) | SVM/Sanvordem (Kudchade) (3 PFs)
LHB_for_18047~
LHB_for_18047~   10701 blog posts
Entry# 5696672            Tags   Past Edits
5 compliments
Useful Great Useful Useful Useful
Few updates from my recent trip in 12779 on 13.04.2023.
1. 12779 CC is exactly reversed by SWR except the 2 parcel vans.
2. Spotted 8 brand new LHB coaches consisting of 6 GS and 2 3ACE coaches most probably for Goa express at Kalem.
3. SVM to Kalem FEDL updates Total 10 kms. SVM outers ground works going on at good pace and
...
more...
the bridge outside SVM ready too, ground works at good progress for around 1km, further around 2 kms no works done most probably some land issue, then for around 7kms double line fully laid till Kalem. Regarding electrification the existing line is electrified and on the new line poles are laid. If the work on the middle 2 kms start immediately now the section can be doubled in next 6 months.
4. Kalem to Kulem existing single line already electrified and doubling works have just begun from Kulem railway station.
5. Kulem to Castle Rock no doubling work, but electric poles have been or are being put up at all places except the tunnels.
6. Castle Rock to Tinaighat doubling update: from CLR for around 30% of the section no work but for remaining around 70% ground fully levelled now ballast laying to commence. Electric poles have but put up besides the area levelled for double line. At CLR I think only the mainline is under wires (not fully sure) but other tracks only poles have been put up wiring still left.
7. LD to Kudachi if fully doubled now and Kudachi to Vijaynagar doubling almost done can be commissioned in next 2 to 3 months. could not notice electrification coz of darkness but poles are definitely there entire route could not or did not see the wiring though.
8. Vijaynagar to MRJ doubling going at slower pace compared to Kudachi Vijaynagar. My trip ended at MRJ.

Translate to English
Translate to Hindi

14 Posts

23787 views
0

Apr 18 2023 (13:07)
LHB_for_18047~
LHB_for_18047~   10701 blog posts
Re# 5696672-15              
Only solution is now Railways reduce the WL they allow and strict action on unauthorised pax penalise them and then shift them to GS.
Translate to English
Translate to Hindi

24315 views
0

Apr 18 2023 (13:08)
LHB_for_18047~
LHB_for_18047~   10701 blog posts
Re# 5696672-16              
Those two parcel vans should be replaced with pax coaches.
Translate to English
Translate to Hindi

24838 views
2

Apr 18 2023 (13:13)
Yusuf_Azhar^   52010 blog posts
Re# 5696672-17              
I will say better to start a clone express of every popular train and leave it.

Khel khatam , But no, India needs more Vande Bharat now.
:-(
Translate to English
Translate to Hindi

23369 views
0

Apr 18 2023 (13:24)
LHB_for_18047~
LHB_for_18047~   10701 blog posts
Re# 5696672-18              
I seriously miss the VSG NZM Clone Humsafar 🥲
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy