Apr 18 2023 (18:08) 17215/Machilipatnam - Dharmavaram Express | MTM/Machilipatnam (2 PFs)
RanvirSiddhanth~
RanvirSiddhanth~ 1686 blog posts2 3 AC coaches permanently augumented. With this sufficient AC coaches are there. Need to augument Sleeper coaches.
7 Posts
Savalyapuram 1 PF+ 4 lines. If 2&3 PF comes, 3 PF and 2 loop lines. Seems 2&3 PFs may come
Munamaka -NRt land levelled, sleeper are kept beside track . Concrete for electric poles laid till some portion.
Signalling equipment and signalling in NRT station. The goods line is dismantled and the goods shed demolition is in progress today. Jungle clearance is also going on.