Search Forum
Blog Entry# 5706152
Posted: Apr 27 2023 (08:39)
4 Responses
Last Response: Apr 27 2023 (23:42)
4 Responses
Last Response: Apr 27 2023 (23:42)
Detailed S&T Plan in connection with construction of connecting line with
Rainagar (SER) to Masagram (ER) Station of HWH - BWN Chord Line Section in Howrah Division.
Rainagar (SER) to Masagram (ER) Station of HWH - BWN Chord Line Section in Howrah Division.
1 Public Posts - Thu Apr 27, 2023
Apatoto Hwh r sathe direct connectivity hoche..4th line hobar somoy bwn theke ekta loop ene direct connection korbe .Ei pase Adra div Bankura ke bypass korar jonno Flyover r DPR ready korche..in future ei route important connection r kaj korbe.. between ER r SER.
2 Public Posts - Thu Apr 27, 2023