Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

RailFanning is a gift you give yourself. - Varun

Search Forum
<<prev entry    next entry>>
Blog Entry# 5714119
Posted: May 05 2023 (14:46)

1 Responses
Last Response: May 05 2023 (17:41)
Rail News
16708 views
1

Commentary/Human Interest
May 05 2023 (14:46)   ICF Chennai Will Now Roll Out Only Eight-Coach Vande Bharat Trains

Rai_abhi^~   3156 news posts
Entry# 5714119   News Entry# 514057         Tags   Past Edits
Catering to the growing demand for semi-high-speed train, all Vande Bharat trains will be rolled out now as eight-coach rake from ICF Chennai.
This...

Rail News
14016 views
1

May 05 2023 (17:41)
PrakharYadav^~
PrakharYadav^~   12843 blog posts
Re# 5714119-1              
Catering to the growing demand for semi-high-speed train, all Vande Bharat trains will be rolled out now as eight-coach rake from ICF Chennai.

This move comes as Indian Railways has decided to ramp up the number of semi-high-speed train and launch the service across the country to cater to the demand.

Barring
...
more...
one 16-coach train for which the production is nearing completion, the ICF will now manufacture eight-coach Vande Bharat trains only, a senior ICF official said.

Currently, two Vande Bharat trains with eight-coach each are operational while the third eight-coach is ready to be pressed into service in Guwahati-New Jalpaiguri section.

The fourth eight-coach Vande Bharat is also nearing completion and expected to be ready this month, ICF maintains.

As per the ICF production plan, there will be total 64 Vande Bharat rakes with eight-coach each train to be manufactured at the facility out of which two have already rolled out and two are almost ready.

Till now total 15 Vande Bharat trains are operational and the 16th is slated to be operational between Puri and Howrah and the 17th will be running in the North East region in May.

However, there is a strong possibility of running another Vande Bharat train connecting coastal Odisha with Western Odisha.

Similarly, an eight-coach Vande Bharat train is likely to be launched in Uttar Pradesh from Gorakhpur to connect Lucknow.

Though there is a Vande Bharat operational for Bhopal now, there is a demand for another Vande Bharat for Indore section.

We have received requests and representations from public representatives all over the country for running Vande Bharat train in their respective regions and our plan is to cater to the popular demands, said a senior railway official.
The railways has a target of producing 75 Vande Bharat trains by 15 August this year.

Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy