May 16 2023 (22:39) 12810/Howrah - Mumbai CSMT Mail (Via Nagpur) (PT)
Rail12345
Rail12345 2333 blog postsPunctuality of SER Mail/Exp/SF/Premium/EMU/MEMU all trains are very very bad since last 2 years. All trains r running late. Mumbai/pune bound trains r late more thanks to SECR also along with SER. RB and RM Silent takes no action. Passengers r suffering. Situation very bad
2 Posts
The solutions i think are below which IR needs to do immediately:
1. Complete 3rd line and 4th line works at fast pace in SER, SECR.
2. Immediately start KGP-SRC 4th line construction as Nalpur to SRC is a bottleneck and trains getting late here also.
3. Complete SRC-Sankrail Flyover fast pace to divert SHM, SRC bound trains and goods trains.
4....
more...
1. Complete 3rd line and 4th line works at fast pace in SER, SECR.
2. Immediately start KGP-SRC 4th line construction as Nalpur to SRC is a bottleneck and trains getting late here also.
3. Complete SRC-Sankrail Flyover fast pace to divert SHM, SRC bound trains and goods trains.
4....
more...
Yeah absolutely true... In march I was travelling with Gondwana Express and that day I lost my interest in long distance train journeys . That train was realllly very very exhausting.... It took 5 and half hours from ngp to r....
I was just fed up.... 12410 ran good till Jhansi... and after that I tried to sleep but couldn't coz of the disturbances after Jhansi.... But really a lot of improvement is required in this zone...
I was just fed up.... 12410 ran good till Jhansi... and after that I tried to sleep but couldn't coz of the disturbances after Jhansi.... But really a lot of improvement is required in this zone...