Search Forum
Blog Entry# 5772809
Posted: Jul 09 2023 (22:37)
3 Responses
Last Response: Jul 14 2023 (13:31)
3 Responses
Last Response: Jul 14 2023 (13:31)
Jul 09 2023 (22:37) 20661/KSR Bengaluru - Dharwad Vande Bharat Express | SBC/KSR Bengaluru City Junction (Bangalore) (10 PFs)
KalindiExpress
KalindiExpress 402 blog postsBetter To Extend Till BGM, Should Be Done In 8 Hours, Timings : -
SBC 6:00
UBL 11:45/11:50
BGM 14:00
BGM...
more...
SBC 6:00
UBL 11:45/11:50
BGM 14:00
BGM...
more...
1 Public Posts - Sun Jul 09, 2023
1 thing can be done, I guess in JS, it has a halt at Tumkur, so time the VB in such a way that JS stands at Tumkur for maybe 10mins, and in that 10mins, within a min or 2 the VB will cross Tumkur and doing so, this won't disturb the run of JS and cause delays....
1 Public Posts - Fri Jul 14, 2023